The FM Handover Checklist: Getting Asset Information Ready for Operations

A practical guide to preparing building asset information for facilities management, covering BIM handover, COBie, the Golden Thread and keeping information accurate throughout a building's operational life.

  • November 2026
  • 5 mins
The FM Handover Checklist: Getting Asset Information Ready for Operations

Building handover often comes with a familiar challenge: a collection of O&M manuals, folders of PDFs and a BIM model that the facilities management team may struggle to use.

A structured COBie spreadsheet should help bridge the gap between construction and operations. Yet, when asset information is incomplete, inconsistent or delivered too late, FM teams can find themselves spending months organising information that should have been ready from day one.

The result is a disconnect between the information collected during a building's design and construction and what is actually needed to operate it.

Getting asset information right before handover is an important step towards better building management. But what does a successful FM handover look like, and what should facilities teams be checking?

What does model-ready asset information actually mean?

A model-ready asset dataset is about more than the quality of a 3D model. It is about having structured, reliable information that facilities teams can access, understand and use throughout a building's operational life.

Three things are particularly important.

Structured information. Building information should be organised in a consistent format, connecting spaces, floors, systems, components, asset records and supporting documentation. This makes it easier to find relevant information without searching through disconnected files.

Complete asset records. Each maintainable asset should have the information needed to identify it, understand its location and support its ongoing maintenance. This includes details such as manufacturer, model, serial number, warranty information and maintenance documentation, where applicable.

Accessible and interoperable formats. Information should be delivered in formats that can be accessed and used beyond the original design and construction process. Open standards such as COBie and IFC can help reduce reliance on proprietary software and make information easier to share between different systems.

When these foundations are in place, building information is much better positioned to support day-to-day facilities management.

Why do BIM models fail to make the transition into facilities management?

The problem often starts long before handover.

BIM models and asset datasets can be developed primarily around the needs of the construction project, without enough consideration for how the information will be used once the building is occupied.

COBie, or Construction Operations Building Information Exchange, provides a standardised way of organising and exchanging building asset information. However, its value depends on the quality of the information being collected and how well it reflects the needs of the receiving FM team.

If asset information requirements haven't been agreed early enough, the resulting dataset may contain missing fields, duplicate records or information that isn't relevant to ongoing operations.

ISO 19650 provides a framework for managing information throughout the lifecycle of a built asset. This includes establishing what information an organisation needs, who is responsible for providing it and when it should be delivered.

Two things are particularly important:

  • Asset Information Requirements (AIR): Define the information needed to operate and maintain the building, including the data required for individual maintainable assets.
  • Responsibility matrix: Establish who is responsible for providing, checking and approving each part of the information.

These requirements should be established early in the project, rather than left until practical completion.

Facilities teams should also be involved throughout the design and construction process. Reviewing information at key project milestones makes it easier to identify gaps while the relevant contractors and project teams are still involved.

Which information should every maintainable asset have?

There isn't one universal list of fields that applies to every building. The information required will depend on the asset type, the organisation and how the building will be managed.

However, there are five key questions that a good asset record should help facilities teams answer:

  1. What is it? Manufacturer, model, asset type and unique identification number.
  2. Where is it? Building, floor, room or space, and its wider system or zone.
  3. Who supplied it? Manufacturer, supplier, installer and relevant installation details.
  4. How is it maintained? Maintenance instructions, service intervals, warranty information and supporting documentation.
  5. What does it connect to? Associated systems, equipment and relevant building infrastructure.

These details help create a consistent asset register that can support maintenance planning, compliance activities and operational decision-making.

COBie provides a structured way to capture much of this information through its Type and Component worksheets. The Type worksheet records information about asset types, while the Component worksheet captures details of individual installed assets.

The important thing is that this information doesn't become another isolated spreadsheet. It needs to remain accessible and connected to the wider building information that FM teams rely on.

When should facilities teams get involved in the handover process?

Ideally, well before construction is complete.

If facilities teams only become involved when the final handover package arrives, they have limited opportunity to influence the information being provided. Missing records and inconsistent data can then become the responsibility of the receiving team to resolve.

A better approach is to involve FM representatives from the outset.

During design: Establish asset information requirements, agree which assets need to be recorded and define the information fields required for each asset type.

During construction: Review and validate asset information as the project progresses. This helps identify missing or incorrect details before they become difficult to resolve.

At handover: Check that the information is complete, accessible and delivered in the agreed formats. Confirm that the receiving FM team can locate assets, access supporting documentation and use the information within its existing operational processes.

After occupation: Establish clear processes for updating asset records when equipment is replaced, spaces are refurbished or building systems change.

The aim is to make sure the information received at handover provides a reliable starting point for ongoing building management.

What does the Golden Thread mean for asset information?

For higher-risk buildings in England, the Golden Thread introduces additional requirements around the management and accessibility of building information.

Under the Building Safety Act 2022 and associated regulations, relevant building information must be maintained digitally, kept up to date and made accessible to those who need it.

This includes information needed to understand how a building has been designed, constructed and managed, particularly where it relates to building safety.

For facilities teams, this reinforces the importance of having accurate, accessible and well-organised building records.

Asset information, maintenance documentation, drawings and compliance records should not exist as disconnected collections of files. They need to be accessible in a way that allows teams to understand the building and retrieve the information they need.

This is where a connected information environment becomes valuable. Bringing asset records, drawings and supporting documents together gives teams a more consistent view of the building and helps reduce the need to search across multiple systems.

How do you keep asset information accurate after handover?

A model-ready dataset is a starting condition, not a steady state.

Buildings change throughout their operational life. Equipment is replaced, spaces are refurbished and building systems are updated. Unless these changes are reflected in the associated asset records and building information, the original handover data will gradually become less reliable.

This is why information management needs to continue beyond practical completion.

Facilities teams should establish clear processes for recording changes, reviewing asset information and ensuring that updates are reflected across the relevant systems.

Connecting information from existing BMS, CAFM and IoT systems can also help provide a more current operational picture, rather than relying solely on static records collected during construction.

Reliable information is particularly important as organisations explore new technologies, including AI and advanced analytics. Fragmented systems and inconsistent data can make it difficult to build confidence in the information being used.

Getting the foundations right at handover helps create better conditions for using building data throughout its operational life.

The FM handover checklist: What should you check?

Bringing these recommendations together, facilities teams should consider the following before accepting a building handover:

  • Asset Information Requirements have been established early in the project.
  • Responsibilities for providing and validating information are clearly defined.
  • Asset information is reviewed at key project milestones.
  • COBie and other agreed information formats are provided.
  • Maintainable assets have complete and consistent records.
  • Asset identification conventions are consistent across the estate.
  • Supporting documentation, drawings and maintenance information are accessible.
  • Golden Thread information is organised and maintained where applicable.
  • Processes are in place to update asset information throughout the building's operational life.

A successful handover isn't simply about receiving a completed BIM model or a collection of documents. It's about making sure the information collected throughout a project remains useful to the people responsible for operating the building.

The estates that get the most value from their building information are those that treat it as an ongoing operational resource, rather than something to be archived once construction is complete.

Making building information work beyond handover

Getting asset information right at handover is only the beginning. Facilities teams also need a practical way to access, connect and maintain that information throughout a building's operational life.

Twinview's Lifecycle Digital Twin™ Platform brings together asset information, drawings, documentation and live building data in one connected environment. By working with the systems and information organisations already have, Twinview helps facilities teams build a clearer picture of their estates without needing to start from scratch or rely on a 3D model.

Find out how Twinview can help connect your building information and support better facilities management.

Ready to see Twinview in action?

Book a personalised demo to explore how we can help your organisation.

Request a Demo